So the time has come to start work on getting the planer up and going after a lot of delay. Have been busy working on the bulldog tractor so I can get it going again and move it out of the shed to make room for some other machines. As well as moving and storing the DSG lathe/CVA lathe/Schaublin lathe/ Mitsui Seiki jig borer/Power surface grinder etc but that all a story for another day.
The first phase with the planer has been to remove the table and consider how to bolt it down and level it up. No easy feat when the table weighs around 1500kg and is 13ft x 3 ft (sorry about the mixed imperial/metric speak). Interested in what everyone thinks about the levelling/bolt down options. The planer sits on a 200cm double reinforced section of concrete in the shed. At the moment the plan is to bolt down with long dynabolts ( 8 of them) with shims to level.
Have attached some photos of removing the table. Will add things as we go
.025.jpg022.jpg010.jpg005.jpg003.jpg
The first phase with the planer has been to remove the table and consider how to bolt it down and level it up. No easy feat when the table weighs around 1500kg and is 13ft x 3 ft (sorry about the mixed imperial/metric speak). Interested in what everyone thinks about the levelling/bolt down options. The planer sits on a 200cm double reinforced section of concrete in the shed. At the moment the plan is to bolt down with long dynabolts ( 8 of them) with shims to level.
Have attached some photos of removing the table. Will add things as we go
.025.jpg022.jpg010.jpg005.jpg003.jpg
0 commentaires:
Enregistrer un commentaire